Special protection scheme for operation of central Zagreb transmission system

Authors

  • Tomislav Plavšić
  • Srđan Skok
  • Igor Ivanković

Abstract

The paper presents a Special Protection Scheme solution for the central Zagreb transmission system. The Central Zagreb transmission system is characterized by a highly meshed network with combined overhead and cable sections and a special operation of the 110 kV cable link between two power plants important for the city’s heat and electricity supply. The Special Protection Scheme is developed using static and dynamic analyses of different network scenarios. Island operation is simulated for a consumption and generation surplus, and an underfrequency load shedding scheme is determined. The Special Protection Scheme architecture is presented with a brief description of the telecommunication infrastructure.

Author Biographies

  • Tomislav Plavšić
    HEP Operator prijenosnog sustava d.o.o., Zagreb, Croatia
  • Srđan Skok
    Faculty of Engineering, University of Rijeka, Rijeka, Croatia
  • Igor Ivanković
    HEP Operator prijenosnog sustava d.o.o., Zagreb, Croatia

Downloads

Published

2011-07-15

Issue

Section

Articles

How to Cite

Special protection scheme for operation of central Zagreb transmission system. (2011). Engineering Review, 31(1). https://www.engineeringreview.org/index.php/ER/article/view/57